The Challenge
Volta River Authority's field teams across the Akosombo and Kpong hydroelectric facilities were completing infrastructure inspection reports on paper forms that were then physically transported to the operations centre, manually entered into a spreadsheet system, and reviewed days after the inspection had occurred. With over 2,400 inspection points across the facilities, the lag between a field observation and a management response was typically 48–72 hours — a safety and operational risk.
Our Approach
We built a custom offline-capable mobile application for field inspection teams — designed to work reliably in the low-connectivity environments inside the dam facilities. Inspectors complete structured digital forms on ruggedised Android tablets, with photo capture and GPS tagging built in. When connectivity is restored, reports sync automatically to a real-time operations dashboard where anomalies are flagged immediately and assigned to the relevant engineering team.
The Results
Field reporting time fell by 85% — from an average of 45 minutes per inspection cycle to under seven minutes. Management visibility of field conditions shifted from a 48–72 hour lag to near-real time. In the first three months of operation, the system flagged two equipment anomalies that were resolved before they escalated into operational incidents. The entire build-to-launch cycle was completed in 120 days.
Client
Volta River Authority
Energy & Utilities
Services Delivered
More Work
All case studies →
Stanbic Business Finance
Full Salesforce CRM implementation and data migration for a pan-African business finance division — unifying 12 regional offices onto one system.
62%
Faster deal cycle

MTN Enterprise
Cloud migration of legacy on-premise infrastructure to AWS — cutting infrastructure costs while improving uptime across four data centres.
38%
Infrastructure cost reduction
Work With Us
Your results could be next.
Book a complimentary strategy call and we will map the right technology path for your business.
Start a Project →